Established in 1986. The hospitals, government offices, hotels and stores below are our team’s delivered drywall and fit-out work — and we are now building in Dubai. We work to the builder’s programme, hold our dates, and hand a job over clean.
From a bare shell to a finished, inspection-ready interior. We do the framing, the linings and the ceilings, and we tie the rest of the interior trades together so the job keeps moving.
Full commercial fit-outs, shell to handover. Framing, linings, ceilings and the trades that sit between them, run as one programme.
Steel-stud and timber framing, plasterboard, fire and acoustic-rated systems, set straight and ready for paint.
Grid and plasterboard ceilings, bulkheads and feature work, set out to the drawings and level.
Office, retail and clinical partitions, including fire and acoustic walls that pass the rating they are built to.
Work inside live buildings — hospitals, government offices, hotels — planned around the people still using them.
Fast, accurate pricing off your drawings, so you can lock your numbers in early and trust them later.
The kind of jobs that do not forgive a missed date — public hospitals, parliament, national retailers. Here is some of the work, by sector.
Sir Charles Gairdner Hospital (E-Block), Ramsay Joondalup, Midland Dialysis and Holyoake — clinical and ward fit-outs delivered in working buildings.
Parliament House of WA refurbishment and the JTSI office floors — refurbishment and multi-floor fit-out to government programme and security.
Mantra Hotel, 900 Hay Street — guest floors, restaurant and reception. Hotel interiors lined and fitted out across the build.
Woolworths stores, Cash Converters, Ghanda Joondalup and Rockingham Central — store fit-outs, finishes and feature work, often handed over overnight.
Summit Homes head office and the Stephenson floors — corporate fit-outs from framing through to finished ceilings.
Tully Road Apartments, East Perth and Carine — apartment and home wall linings and ceilings at volume.
| Ref | Project | Sector | Scope |
|---|---|---|---|
| P-01 | Mantra Hotel, 900 Hay St Perth | Hospitality | Hotel fit-out, linings & ceilings |
| P-02 | Sir Charles Gairdner Hospital — E-Block | Healthcare | Hospital fit-out |
| P-03 | Parliament House of WA | Government | Refurbishment fit-out |
| P-04 | JTSI Offices | Government | Four-floor office fit-out |
| P-05 | Ramsay Joondalup | Healthcare | Health campus fit-out |
| P-06 | Midland Dialysis | Healthcare | Clinical fit-out |
| P-07 | Holyoake | Community / Health | Two-floor fit-out |
| P-08 | Sonas Childcare | Education | Childcare fit-out |
| P-09 | Woolworths (multiple stores) | Retail | Store fit-outs & finishes |
| P-10 | Cash Converters | Retail | Store fit-out |
| P-11 | Ghanda, Joondalup | Retail | Store fit-out, timber feature |
| P-12 | Rockingham Central — Stage 2 | Retail | Centre fit-out |
| P-13 | Summit Homes Head Office | Commercial | Corporate fit-out |
| P-14 | Stephenson (Levels 5–6) | Commercial | Two-floor office fit-out |
| P-15 | Tully Road Apartments, East Perth | Residential | Apartment linings & ceilings |
| P-16 | Carine, Beach Rd | Residential | Wall linings & ceilings |
Sixteen selected works from a delivered record of 350+ projects. Full reference list available on request.
If we have given you a date, we build to it. Our part of the job does not blow out the programme, and head contractors plan around that.
Hospitals and government offices cannot shut down for us. We sequence our work around the people still using the space, with the paperwork to match.
The people who price the job are the people who run it on site. Nothing gets lost between the quote and the handover.
We finish ready for the next trade and ready for inspection. Not nearly there — done, and off your snag list.
Send us your drawings and we’ll come back with a number.